Description
Application Description
STIR THOROUGHLY BEFORE USE. Seal new or bare surfaces with a thinned first coat of Armstead Trade Floor Paint (up to 1 part white spirit to 10 parts paint). The normal finishing process is 1 or 2 full coats of Armstead Trade Floor Paint. Touch dry: 4-6 hours. Recoat: 16-24 hours. It is essential to allow the coated floor to dry for a minimum of 24 hours under well-ventilated conditions before use. Coverage up to 16m²/l on smooth surfaces of average porosity.
Technical & Safety Documentation
Application-Brush or roller only. For Health and Safety reasons related to all solvent based paints, spray application is not recommended.
